• Image 1
  • Image 2
  • Image 3
  • Image 4
  • Image 5
  • Image 6

Containerized Classroom/Office Units Modular Container House Expansion Project On School Existing Buildings

R608099.68
Categories:

Buy With Confidence

100% Safe Payment


;

  • Description

     

    Containerized Classroom/Office Units Modular Container House Expansion Project On School Existing Buildings

     

     

     Introduction: 

     

       FASECbuildings has upgraded the current version of container modules. Just like the automobile industry, all the components of the new version of container modes are made from standard and automatic production procedure. Customers only need to follow the manual and assemble the components together.
    Installation procedure of the new version containers are easy and convenient operation with heavy lifting equipments. Customer can follow the drawings and enjoy the DIY assembly process with friends and family. This ease of assembly reduces the on site labor requirement. 

    FASECbuildings container units are modular with the use of steel structural frame and thermal resistant material. This energy efficient product is commonly used in school classroom/office units, Construction camp site, Public building, Residential units and Special application areas.

    Engineering construction is a systematic and complicated work, FASECBuildings technical team can provide to the early stage of construction engineering technology consulting services for customers, to further ensure a high standard of Engineering quality.

     

    Specifications: 

     

    size length 2140/3105/4070/5035/6008/6058/6950mm
    width 2438/3000mm
    height 2600/2800/3000/3200mm
    clear height indoor 2265/2465/2665/2865/3065mm

     

    component long beam 3mm galvanized
    short beam 2.5mm galvanized
    column 3mm galvanized
    wall panel 75mm EPS/Rock Wool/PU/Glass wool/XPS sandwich board
    roof panel 75mm PU sandwich board
    secondary beam C-shaped galvanized steel iron
    roof insulation 50~120mm Glass wool/Rock Wool
    Floor panel 18mm MgSO4/18mm cement-fiber +1.5/2/3mm PVC
    door Steel Security door,860mmx2050mm
    window PVC/Aluminum Sliding window with steel bar ,1130mmx1200mm
    electronics, water supply and drainage according to the local law
    furniture and appliance Customized-made to your requirements

     

     

    微信图片_20190805150341

     

    Application Scope : Camp Site Container Units Solution; Residential Container Units Solution;Public Container Units Solution .etc.

     

     Container House Advantage :  Structural safety, Durability ,Long Service life-time, Water resistant ,Fire proof, Easy assembly, Flexible application with modular combination , Good appearance , Cost and economic advantages.etc .

     

     

    Production capacity

    The skilled workers are the valuable wealth of FASECBuildings, through the continuous optimization of production technology and production process improvement, FASECBuildings and all the products have a leading position in the quality.

     

     

    Packaging & Shipping

     

    Design of uniformed parts can reduce the packing volume.Each parts is packed independently,and then grouped together for ease shipping loading or unloading.then save much manpower will required. 

     

    WBG016DYV5U(H2}(OR{2M46_副本

     

     

    Our Service

    1. We can supply the design according your requirement.

    2. Supply high quality production,welcome to you visiting our factory and testing the production.

    3. We will reply you for your inquiry in 24 hours.

    4. We can send engineer to site for guiding,or send installation team to install.

     

    WU$DHT9IANXCMPJ3R_[UJ_H_副本

    After sending, we will track the products for you once every two days, until you get the products. When you got the goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer the solve way for you.

     

    QQ图片20190805145319_副本_副本

     

     

     

Follow us on:

Subscribe to our Newsletter
Please wait...